Meet us at Capacity Europe I London, October 15, 2024

Stavanger-Newcastle

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

  • Cabel length 700 km
  • Latency 7 ms
  • Speed 400 Gbit/s
  • Capacity 260 Tb